黄色AV录像,免费成人黄色A片,99热超碰在线观看,国产日韩成人AV,日韩av成人无码

To provide customers with systematic
and intelligent water treatment solutions
Current location: Home Page > News > Industry Trends
Significance of dynamic simulation test of circulating cooling water
Time:2021-07-08 10:05:39
Article release:Admin
Original author:Unknown
Source:Internet

Significance of dynamic simulation test of circulating cooling water



Dynamic simulation test is a test method to study the corrosion and scaling of circulating cooling water system. Simulate the cooling water quality of the production site to prepare and directly use the site water if possible. The test tube is ∮10×1 or ∮19×2mm. The flow rate of water in the design pipe is about 1.0m/s, the water temperature at the inlet of the heat exchanger is 25 ~ 45℃, the temperature difference between the inlet and outlet is about 5℃, the fluctuation of the water temperature at the inlet is ±0.02℃, and the concentration multiple is 2 ~ 5 times. The test period is generally 7 ~ 14 days, some up to a month. Test tubes of the tube after knot speed check made by determination of fouling resistance, different temperature, the average pitting and scale thickness data, tube and coupon corrosion rate) and analyze the composition of scale sample made by comprehensive judgment of circulating cooling water corrosion and scaling tendency, the test device is dynamic, the heat transfer surface, as the single pipe or tube type heat exchanger, simulation of the cooler in the production of material, It is an ideal comprehensive test method to evaluate the water stable formula and process conditions in the laboratory. The experimental data can provide the basis for pilot test and field application.


Our company just developed in recent years, the introduction of domestic monitor of corrosion and scaling, its principle is the same as the scale and dynamic monitoring devices, this new instrument can not only assess dynamic scaling condition, a heat load, also to assess the corrosion condition, the difference is: corrosion fouling monitoring of heat exchange tube directly by electric heating, cold water flows through the heat pipe outside at the same time.





Label:
91视频永久免费看| a级片欧美| 久草av观看| 无码免费对对碰| 超碰一级黄色A片| 丝袜av在线观看| 亚洲東大精品一区二区| 亚洲无码A级片| 无码一期二期三期| 一级做视频c视频播放| 开心色情五月天| 日韩A片视频播放| 亚洲91黄色片| 亚洲成年人A片| AV黄色网址在线观看| 在线看成人A V| 婷婷五月天黄色| 董色毛片| 亚洲Av一区| 人人色人人色| 亚洲黄色电影| 久久人人9| 超碰资源亚洲| 中日韓一级片| 3级a片电影网站。| A片无码小视频| AV无码免费| 国产高清Av| 一级片久久草| 亚洲无码成人AV电影| 色色色888| 成人年A片电影| 亚洲高清无码二区| 黄色五级A片| a片在线网址| 黄色成人AV网| 日韩无码www| 亚洲无码一区二区三| 久久综合施舍| 日本无码久久| AV黄色在线一区二区|